This is the full-scope project — the same process behind our reference 500 sow farrow-to-finish package, scaled to your target. It covers every house, every utility and every system, delivered against one schedule.
Phase 1 — Design
We start from your target output, site size and climate. You receive layout drawings for each house, an equipment list with quantities and weights, a container loading plan and a fixed quotation. Drawings are issued in metric or imperial units, in English.
Phase 2 — Manufacturing
Frames, panels and flooring are produced in our own workshop; hot-dip galvanizing is measured for coating thickness. Every batch receives a pre-shipment inspection with photographs before it leaves the factory.
Phase 3 — Shipping
We load phased containers with a packing list per batch and handle documentation on FOB, CIF, DAP or DDP terms, so unloading at your site is predictable and each container can be matched to a construction stage.
Phase 4 — Installation & training
Our engineer arrives for commissioning, sets the ventilation and feeding controllers, and trains your farm staff on daily operation and maintenance. You also receive a spare-parts list with recommended stock levels.
Phase 5 — After-sales
Two-year warranty on frames and galvanizing, plus spare parts shipped at cost for the life of the equipment. Technical questions are answered by the same engineers who designed your farm.