Solutions

Complete Pig Farm Project

Complete pig farm project from drawing to commissioning: design, equipment manufacturing, shipping, installation, training and after-sales support.

This is the full-scope project — the same process behind our reference 500 sow farrow-to-finish package, scaled to your target. It covers every house, every utility and every system, delivered against one schedule.

Phase 1 — Design

We start from your target output, site size and climate. You receive layout drawings for each house, an equipment list with quantities and weights, a container loading plan and a fixed quotation. Drawings are issued in metric or imperial units, in English.

Phase 2 — Manufacturing

Frames, panels and flooring are produced in our own workshop; hot-dip galvanizing is measured for coating thickness. Every batch receives a pre-shipment inspection with photographs before it leaves the factory.

Phase 3 — Shipping

We load phased containers with a packing list per batch and handle documentation on FOB, CIF, DAP or DDP terms, so unloading at your site is predictable and each container can be matched to a construction stage.

Phase 4 — Installation & training

Our engineer arrives for commissioning, sets the ventilation and feeding controllers, and trains your farm staff on daily operation and maintenance. You also receive a spare-parts list with recommended stock levels.

Phase 5 — After-sales

Two-year warranty on frames and galvanizing, plus spare parts shipped at cost for the life of the equipment. Technical questions are answered by the same engineers who designed your farm.

What This Package Includes

Project Process

1
Design

Layout drawings, equipment list, container plan and fixed quotation

2
Manufacturing

Production, galvanizing and pre-shipment inspection with photos

3
Shipping

Phased containers with packing list per batch, full documentation

4
Installation

On-site engineer, commissioning of ventilation and feeding controllers

5
Training & after-sales

Staff training, spare-parts list, two-year warranty and ongoing support

Frequently Asked Questions

Design 1–2 weeks, production 30–45 days, shipping 15–35 days depending on destination, installation 30–45 days. Phased shipping allows work to start earlier.

Two years on frames and galvanizing, one year on electrical components, with spare parts at cost afterwards.

Yes — foundation, anchor and layout drawings in English, which your local engineer can submit for approval.

Have a pig farm project in mind?

Send us your farm size, house dimensions and target output — we will come back with equipment list, layout drawing and budget estimate.

Home Products WhatsApp